Approved Tariff

Click here for pdf file

Distribution & Retail Supply Tariff

 

Approved Distribution & Retail Supply Tariff

Sr. No.

Category of consumers

Energy Charges (Paise per unit) 2009-10

Energy Charges (Paise per unit) 2010-11

Fixed Charge (2010-11)

FSA (Paise per unit)

1

Domestic (LT)

 

Upto 40 units per month

263

263

Nil

15

41 - to 300 units per month

363

375

29

301 to 500 units per month

428

455

37

501 and above units per month

428

490

37

Monthly Minimum charge shall be  80 per kW or part thereof per month of connected load

 

2

Non Domestic

 

Up to 20 kW

419

440

Nil

31

Above 20 kW

419

460

130 per kW of connected load per month

31

Monthly Minimum charge shall be  240 per kW or part thereof per month of connected load

 

3

Independent Hoarding / Decorative Lightning

419

595

As applicable to Non Domestic

31

Monthly Minimum Charge as applicable to Non Domestic

 

4

HT Industry( above 50 kW)

 

Supply at  11 KV

409

415

120 per kVA of sanctioned contract demand per month

31

Supply at 33 KV

397

403

31

Supply at 66 KV or 132 KV

385

391

31

Supply at 220 KV

377

383

31

Arc / Steel furnace (at any voltage level +15 Paise surcharge if supply is at 11 KV)

409

415

31

5

LT Industry - upto 50 kW

 

Up to 20 kW

428

430

Nil

32

Above 20 kW

428

430

100 per kW of connected load per month

32

Monthly Minimum charge shall be applicable  to the consumers having connected load upto 20 kW @ 225 per kW or part thereof per month of connected load

 

6

Agriculture

 

Metered

25

25

Nil

 

Un-metered (Per BPH/Month)

35

Nil

35

 

Monthly Minimum charge shall be applicable  to the metered consumers @ 200 / BHP per year

 

7

Public Water Works

400

410

145 per kW of connected load per month

30

8

Lift Irrigation

400

419

120 per kW of connected load per month

30

9

MITC

400

419

120 per kW of connected load per month

30

10

Railway Traction

 

Supply at 11 KV

409

455

125 per kVA of recorded contract demand per month

30

Supply at 33 KV

397

443

30

Supply at 66 KV or 132 KV

385

431

30

Supply at 220 KV

377

423

30

(Fixed Charges  @   60 / KVA / month for 2009-10)

     

11

Bulk Supply 

 

Supply at LT

419

440

130 per kW of connected load per month

31

Supply  at 11 kV

409

430

31

Supply at 33 KV

397

418

31

Supply at 66 KV or 132 KV

385

406

31

Supply at 220 KV

377

398

31

12

Bulk Supply  Domestic (70 KW and above at 11 KV or above voltage)

350

360

50 per kW of the recorded demand per month

31

13

Street Lighting

415

415

 

31

Monthly Minimum charge shall be 150 per kW or part thereof per month of connected load

 

14

DMRC

 

Supply at 66 KV

 

395

125 per kVA of recorded contract demand per month

30

Supply at 132 KV

 

380

30

15

Temporary Metered (1.5 times the tariff of relevant category for which temporary supply has been sought)

 

 

Transmission and SLDC Charges (FY 2010-11)

 

  1. The recovery of transmission cost shall be @ 414.44 Millions (UHBVNL) and 398.19 million (DHBVNL) per month.
  2. SLDC charges of 9.43 Million per month for FY 2010-11.
  3. Transmission tariff for short-term open access customers shall be 0.28/ kWh.

 

 

Generation Tariff (HPGCL) (FY 2010-11)

 

 

PTPS

(Unit 1-4)

PTPS

(Unit 5)

PTPS

(Unit 6)

PTPS

(Unit 7)

PTPS

(Unit 8)

DCR TPP

(Unit 1&2)

RGTPP

(Unit 1 &2)

WYC & Kakroi

Total HPGCL

Energy Charges (/kWh)

2.64

2.17

2.17

2.03

2.03

1.79

1.44

-

1.8600

Fixed Charges (/kWh)

0.91

0.56

1.09

0.98

0.98

1.34

1.47

1.49

1.1944

Total Charges

/ kWh

3.55

2.73

3.26

3.01

3.01

3.13

2.91

1.49

3.0544

 

 

Tariff for Renewable Energy Sources

 

Particulars

Wind

Mini Hydel (upto 2 MW)

Biomass

Bagasse (Cogeneration)

Tariff ( / kWh) base year FY 2007-08

4.08

3.67

4.0

3.74

Annual Escalation from FY 2008-09

1.5%

1.5%

3%#

2%

# Escalation on base tariff ( 4.0 / kWh) applicable from FY 2009-10

 

Solar (SPV) Tariff

Solar Power plants commissioned up to 31.12.2009

15.96 / kWh

Solar Power plants commissioned after 31.12.2009 but by 31.03.2010

15.16 / kWh

Note: If the project qualifies for generation based incentive then the tariff payable by the Discoms shall be the difference of the above mentioned tariff and incentive.

 

Wheeling Charges for Distribution Open Access Consumers

 

Rate

46 Paise per Unit