PART 1 General

1. Short title, Commencement and Interpretation
2. Definitions

Chapter II Standards of Performance

3. Guaranteed and Overall Standards of Performance
4. Power to modify
5. Exemption

Chapter III Compensation

6. Compensation
7. Procedure for payment of compensation

Chapter IV Furnishing Information, Issue of Orders

8. Information on Standards of Performance
9. Issue of orders and practice directions
10. Power to remove difficulties
11. Implementation / Transition Period
12. Savings
Schedule I
Schedule II
Schedule III

HARYANA ELECTRICITY REGULATORY COMMISSION 

PANCHKULA

Notification

The 16th July 2004

Regulation No. HERC/04/2004 

STANDARDS OF PERFORMANCE FOR THE DISTRIBUTION LICENSEE

In exercise of the powers conferred under Section 57 and 59 read with subsection 2(za) and 2(zb) of section 181 of the Electricity Act 2003 (Act No.: 36 of 2003) and all other powers enabling in this behalf, the Haryana Electricity Regulatory Commission specifies through these Regulations the Standards of Performance for the Distribution Licensee.

PART – I GENERAL

1.      Short title, Commencement and Interpretation

(1)   These regulations may be called the Haryana Electricity Regulatory Commission (Standards of Performance for the Distribution Licensee) Regulations, 2004.

(2)    These regulations shall be applicable to all licensees engaged in distribution & retail supply of electricity in the State of Haryana.

(3)    These regulations shall extend to the State of Haryana.

(4)    These regulations shall come into force on the date of their publication in the Haryana Government. Gazette.

(5)    The Punjab General Clauses Act 1898 (Act 1 of 1898), as applicable to the state of Haryana shall apply to the interpretation of these regulations.

2.      Definitions

2.1   In these regulations, unless the context otherwise requires: -

a.    “Act” means the Electricity Act, 2003;

b.     “Area of supply” means the area within which a licensee is  authorised by his license to supply electricity;

      “Commission” means the Haryana Electricity Regulatory Commission;

d      “Consumer” means any person who is supplied with electricity for his own use by a licensee or the Government or by any other person engaged in the business of supplying electricity to the public under this Act or any other law for the time being in force and includes any person whose premises are for the time being connected for the purpose of receiving electricity with the works of a licensee, the Government or such other person, as the case may be;

e       “Extra High Tension/Extra High Voltage” means the voltage exceeding 33000 volts under normal conditions;

f        “High Tension/High Voltage” means the voltage exceeding 440 Volts but not exceeding 33000 volts under normal conditions;

g        “Licensee” means the Distribution and/or Retail supply Licensee;

h        “Low Tension/Low Voltage” means the voltage not exceeding 440 Volts under normal conditions;

i         “Period of Load Shedding” means a period during which the demand is more than supply and there is no spare/reserve capacity available to meet the surplus demand and SLDC have directed the licensee to reduce load and/or to avoid overloading.  During this period licensee should adhere to rotational load shedding or any other means so that the same consumer does not suffer continuously for a period as specified in the regulation. A period of grid failure will not be covered under it;

j         “Period of Scheduled outage” means a period during which there is a reduction of capacity or taking out-of-service of a generating unit, power station or part of the transmission system or distribution system for scheduled repairs and preventive maintenance in a planned manner. If the above repair and maintenance activity could not be carried out within the time frame laid down in this regulation on account of abnormal circumstances of a given job, the area in-charge need to obtain approval of CE/ SE (Operation) for the extended period of outage. The licensee would submit a monthly report of such cases to the Commission. Period of forced outage will not be covered under it.

k        All other expressions used herein but not specifically defined herein but defined in the Act shall have the meaning assigned to them in the Act.  The other expressions used herein but not specifically defined in these regulations or in the Act but defined under the Haryana Electricity Reform Act, 1997 shall have the meaning assigned to them under the said Act, provided that such definitions in the Haryana Electricity Reform Act, 1997 are not inconsistent with the provisions of the Electricity Act, 2003.

 

CHAPTER II  STANDARDS OF PERFORMANCE

3.     Guaranteed and Overall standards of performance

3.1   The Standards of Performance specified shall be the minimum standard of service with reference to quality, continuity and reliability of services that a licensee shall achieve in discharge of his obligations as a licensee.

3.2     Standards of Performance specified in Schedule I relates to Guaranteed Standards of Performance for which consumers against whom no arrear is pending on the date of violation are eligible for compensation in the manner provided in the Schedule I in case the Licensee fails to achieve the Standards of Performance.

3.3     In case of applications requiring supply under agriculture category (Agriculture Pump sets) licensee’s obligation shall be limited to the number of connections that can be covered within the target fixed by the State Government for release of agricultural connections for a financial year. The target for an ensuing year should be fixed and made public at least 2 months before the commencement of the year. The licensee shall inform the applicants in writing within 15 days of receipt of applications, if the applicants’ case cannot be covered in the programme of release of Agriculture Pump set connections fixed for the year.

3.4    Schedule II relates to Overall Standards of Performance, which indicates the level of performance the licensee shall seek to achieve in the discharge of his obligations as a licensee.

4.      Power to modify

The Commission may, at any time, add, vary, alter, modify or amend any of the provisions of these regulations including the contents of the Schedule I, II and III.

5.      Exemption

5.1     The standards of performance specified in these regulations shall remain suspended during Force Majeure conditions such as war, mutiny, civil commotion, riot, flood, cyclone, lightning, earthquake or other causes beyond the control of the Licensee and strike, lockout, fire affecting the licensee’s installations and activities.

5.2    The Commission may by a general or special order, issued for the purpose, after hearing the Licensee and the affected consumer group relieve the Licensee from the liability to compensate the consumers for any default in the performance of any standard if the Commission is satisfied that such default is for reasons other than those attributable to the Licensee & beyond the control of the Licensee and further that the Licensee has otherwise made efforts to fulfill his obligations.

  

CHAPTER III  COMPENSATION

6.     Compensation

6.1     If the Licensee fails to meet the Standards of Performance specified in Schedule I, the licensee shall pay to the affected consumer against whom no arrear is pending on the date of violation, the compensation as indicated against each of the Standards of Performance in Schedule I.

6.2    The Licensee shall register every complaint of a consumer. The Licensee shall computerise the registration of every complaint of a consumer through automatic answering machine or any other such means intimating the complaint number to the consumer automatically.

6.3     The Licensee shall maintain relevant records consumer-wise regarding the Standards of performance in order to give a fair treatment to all consumers and avoid any dispute regarding violation of standards.

6.4      All payment of compensation shall be made by way of adjustment against existing, current and/or future bills for supply of electricity.

Provided the compensation shall be paid in Cash/ Demand draft wherever the claimant ceases to be the consumer of the utility.

Provided that all the compensation shall be made within 90 days from the date of violation of a guaranteed standard of performance. If the Compensation is not adjustable in the existing, current and/or future bills of the supply of electricity the same should be paid in cash / demand draft to ensure that the compensation is paid within 90 days from the date of violation of a guaranteed standard of performance.

7.      Procedure for payment of compensation

7.1       The claim for compensation shall be dealt with in the following manner

7.2     Automatic

This mode of payment requires the Licensee to pay the compensation amount to the affected consumer automatically in the next billing cycle, following non-compliance of a particular standard.

7.3     To be Claimed

This mode of payment requires the consumer to bring to the notice of the Licensee that the standard has been violated and accordingly claim the compensation amount from the Licensee. In respect of payment of compensation, the Licensee shall take a decision and, if found liable, shall pay the compensation to the consumer within 90 (ninety) days from the date of violation of a guaranteed standard of performance.

CHAPTER IV  FURNISHING INFORMATION, ISSUE OF ORDERS

8.      Information on Standards of Performance

8.1   Every Licensee shall furnish to the Commission the following information in the Performa placed at Schedule-III. 

 a      The level of performance achieved in respect of matters covered in schedule I and II of these Regulations shall be furnished quarterly.

 b           The number of cases in which compensation was paid under these Regulations and amount of the compensation in each case, shall be furnished quarterly.

8.2      The Commission shall arrange for publication of the above information, at least once in a year, in the manner as deemed fit.

8.3        Reliability Indices

(a)      The following reliability/outage indices are prescribed by the Institute of Electrical and Electronics Engineers (IEEE) Standard 1366 of 1998. The licensee shall compute and report the value of these indices as per the formula and methodology specified below from 2004-05 onwards:

 (i)     System Average Interruption Frequency Index (SAIFI):

 (ii)    System Average Interruption Duration Index (SAIDI):

 (iii)    Momentary Average Interruption Frequency Index (MAIFI):

 (b)     Method to compute Distribution System Reliability Indices

The Indices shall be computed for the Distribution licensee as a whole by stacking, for each month, all the 11 KV feeders in the supply area, excluding those serving predominantly agricultural loads, and then aggregating the number and duration of all interruptions in that month for each feeder. The Indices would then be computed using the following formula:

                 

Where,

Ai = Total number of sustained interruptions (each longer than 5 minutes) on ith feeder for the month

Ni = Connected load of ith feeder affected due to each interruption

Nt = Total connected load at 11KV in the Distribution licensee’s supply area

n =  Number of 11KV feeders in the licensed area of supply (excluding those serving predominantly agricultural loads)

                                                

 Where,

 Bi =   Total duration of all sustained interruptions on ith feeder for the month.

                                                                         

           

 Where,

Ci = Total number of momentary interruptions (each less than or equal to 5 minutes) on ith feeder for the month

Note: The feeders must be segregated into rural and urban and the value of the indices must be reported separately for each month. However interruptions due to load restrictions, power cut, shut down shall not be taken into account while calculating the indices 

 (i)       The licensee shall compute the value of these indices separately for feeders serving predominantly agricultural loads. The methodology for computation of indices shall remain the same as in the case of other feeders.

(ii)          Based on the information provided by the licensees, the Commission would notify the target levels for these indices annually.

9.     Issue of orders and ‘practice’ directions

Subject to the provisions of the Act and these regulations, the Commission may, from time to time, issue orders and ‘practice’ directions in regard to the implementation of the Regulations and Procedures to be followed.

10.    Power to remove difficulties

10.1  If any difficulty arises in giving effect to any of the provisions of these regulations, the Commission may, by general or special order, direct the licensee to do anything not being inconsistent with the provisions of the Act, which appears to it to be necessary or expedient for the purpose of removing the difficulties.

10.2 The Licensee may make an application to the Commission and seek suitable orders to remove any difficulty that may arise in implementation of these Regulations.

11.    Implementation / Transition Period

The standard indicating the maximum time limit for rendering the service is in line with the documents already approved by the Commission. Thus the licensee should not face any difficulty in the implementation of the same. However, the Licensee would be allowed a period of six months from the date of notification of this regulation for putting the required infrastructure in place. From 1st February 2005 the mock exercise would be carried out to make the system perfect and implementable. The actual payment of monetary compensation to the consumer w.r.t the provisions of these regulations would start from 1st August 2005 for urban consumers and from 1st August 2006 for rural consumers.

12.     Savings

Nothing in these regulations shall affect the rights and privileges of the consumers under any other law including the Consumer Protection Act, 1986 (Act 68 of 1986).

By order of the Commission

 Sd/-
Secretary

HERC

 

SCHEDULE – I

 GUARANTEED STANDARDS OF PERFORMANCE

Sr. No.

Nature of Service

Standard (indicating Maximum time limit for rendering service)

Amount of Compensation payable to affected consumer

Manner of payment

 

1

Normal Fuse Off

Cities and Towns

Within 4 hours

Within 2 hrs. of receipt of complaint, complainant shall be informed about the likely time to be taken for restoration of supply if asked for by the complainant.

 

 

Rs. 100 in each case of default

Automatic

Rural Area

Within 8 hours

2

Line Breakdowns

Cities and Towns

Within 8 hours

(12 hrs if pole gets broken)

Rs. 100 to each    affected consumer

Automatic

Rural Area

Within 16 hours (24 hrs if pole gets broken)

3

Distribution Transformer Failure

Cities and Towns

Within 24 hours

Rs. 100 per day or part thereof to each    affected consumer subject to a maximum of Rs 3000/-

Automatic

Rural Area

Within 48 hours

4

Major Power Failure involving Power Transformer / Equipment etc.

Cities and Towns

Within 7 days. Alternate arrangement, to restore the supply to the affected area, to be made within 24 hrs.

Rural Area

5

Period of Load Shedding

 

Not to exceed 4 hrs. per day continuously for 4 days

Normal supply to be restored within 72 hrs.

Rs. 100 per day or part thereof to each    affected consumer subject to a maximum of Rs 3000/-

Automatic

6

Period of Scheduled outages

Maximum duration at a stretch

Not to exceed 8 hours on any day

Consumers to be informed, at least, 24 hrs. in advance

Rs. 200 to each affected consumer

Automatic

Restoration of supply

By 6 PM on any day

7

Voltage Variations LT= +/- 6 %

HV = +6 % &            

           - 9% 

EHV = +10%

      & -12.5 %

Where no expansion of network is involved

Within 4 hrs. in cities & towns & 8 hrs. in rural area

Within 2 hrs. of receipt of complaint, complainant shall be informed about the likely time to be taken for redressal of complaint

Rs. 100 in each case of default

 

Automatic

Where up-gradation of LT distribution system is required

Within 60 days

Rs. 100 per day or part thereof in each case of default to each affected consumer subject to a maximum of Rs 3000/-

Where up-gradation of High Tension/ EHT distribution system is required

Within 180 days

Opening of neutral and neutral voltage exceeding 2% of supply voltage

Within 4 hour

Rs. 100 in each case of default

 

8

Meter Complaints

Inspect and check correctness

Within 7 days of receipt of meter testing fee

Rs.100 for each day of delay subject to a maximum of Rs 3000/-.

Automatic

Replace slow/fast meters

Within 7 days of its being so established on checking.

Replace creeping or stuck meters

Within 7 days of its being so established on checking.

Replace burnt meters if cause not attributable to consumer

Within 7 days of receipt of complaint

Rs.200 in each case of default

Replace burnt meters in all other cases

Within 24 hours of payment of charges by consumer

9

Application for new connection/ additional load/ Temporary Connection

Release of supply where service is feasible from existing network

Within one month of receipt of application complete in all respect along with prescribed charges

Rs. 200 for each day of default, subject to Section 44 of Act and also subject to a maximum of Rs 3000/-.

Automatic

Release of supply where Distribution Network expansion / Commissioning of New Sub Station required for providing connection

Immediately after expansion/ Commissioning or with in such period as specified by the Commission

Rs. 200 for each day of default in case of LT, Rs. 500 for each day of default in case of HT & EHT & Rs. 1000 for each day of default in case of Commissioning of New Sub Station subject to Section 44 of Act

To be claimed

 

Agriculture Pump Sets

Within 30 days after attaining seniority (The no. of new connections shall be limited to the target fixed for the year)

Rs.100 for each day of default subject to Section 44 of Act and also subject to a maximum of Rs 3000/-.

10

Transfer of ownership, change of category

Within 7 days of receipt of application complete in all respect

Rs. 100 for each day of default subject to a maximum of Rs 3000/-.

Automatic

11

Conversion of LT single phase to LT three phase, Conversion from LT to HT and vice-versa

Within 30 days from the date of payment of charges

Rs. 100 for each day of default subject to a maximum of Rs 3000/-.

Automatic

12

Redressal of consumer’s complaint regarding billing

If no additional information is required

Within 24 hours of receipt of complaint

Rs. 100 for each day of default subject to a maximum of Rs 3000/-.

Automatic

If additional information is required

Within 7 days of receipt of complaint

13

Reconnection of supply following disconnection

Cities and Towns

Within 6 hours of receipt of payment from consumer

Rs. 100 for each day of default subject to a maximum of Rs 3000/-.

Automatic

Rural Area

Within 12 hours of receipt of payment from consumer

14

Refund of Advance Consumption Deposits/ Consumption Security, meter Security

Within 30 days after receipt of request

Rs. 100 for each day of default subject to a maximum of Rs 3000/-.

To be claimed

15

Issue of No Due Certificates

Latest by 5PM next day of receipt of request

Rs. 100 for each day of default subject to a maximum of Rs 3000/-.

To be claimed

16

Shifting of meter/ Service Connection/ Lines/ Equipments

Shifting of meter/ Service Connection

Within 15 days after receipt of request along with prescribed charges

Rs. 100 for each day of default subject to a maximum of Rs 3000/-.

Automatic

Shifting of LT / HT Lines

Within 45 days after receipt of request along with prescribed charges

To be claimed

Shifting of Transformer Structure

Within 60 days after receipt of request along with prescribed charges

 

SCHEDULE – II

OVERALL STANDARDS OF PERFORMANCE 

S. N.

Nature of Service

Standard (Indicating Time Limit for rendering Service)

Overall Standards of Performance

1

Normal fuse-off

Cities and Towns

Within 4 hours

99%

Rural Area

Within 8 hours

2

Line Breakdowns

Cities and Towns

Within 8 hours (12 hrs. if pole gets broken)

95%

Rural Area

Within 16 hours (24 hrs. if pole gets broken)

3

Distribution Transformer Failure

Cities and Towns

Within 24 hours

95%

Rural Area

Within 48 hours

4

Major Power Failure involving Power Transformer / Equipment etc.

Cities and Towns

Within 7 days.

Alternate arrangement, to restore the supply to the affected area, to be made within 24 hrs.

95%

Rural Area

5

Period of Load Shedding

Not to exceed 4 hrs. per day continuously for 4 days

Normal supply to be restored with in 72 hrs.

95%

6

Period of Scheduled outage

Maximum duration at a stretch

Not to exceed 8 hours on any day

99%

Restoration of supply

By 6 PM on any day

7

Voltage Variations

Where no expansion of network is involved

Within 4 hrs. in cities & towns & 8 hrs. in rural area

95%

Where up-gradation of LT distribution system is required

Within 60 days

90%

Where up-gradation of High Tension /EHT distribution system is required

Within 180 days

85%

Opening of neutral and neutral voltage exceeding 2% of supply voltage

Within 4 hrs.

99%

8

Meter Complaints

Inspect and check correctness

Within 7 days of receipt of meter testing fee

95%

Replace slow/fast meters

Within 7 days of its being so established on checking.

Replace creeping or stuck meters

Within 7 days of receipt of complaint

Replace burnt meters if cause not attributable to consumer

Within 7 days of receipt of complaint

Replace burnt meters in all other cases

Within 24 hours of payment of charges by consumer

9

Application for new connection/Additional load connection/ Temporary

Release of supply where service is feasible from existing network

Within one month of receipt of application complete in all respect along with prescribed charges

95%

Release of supply where Distribution Network expansion / Commissioning of New Sub Station required for providing connection

Immediately after expansion/ Commissioning or with in such period as specified by the Commission

95%

Agriculture Pump Sets

Within 30 days after attaining seniority (The no. of new connections shall be limited to the target fixed for the year)

80%

10

Transfer of ownership, change of Category

 

Within 7 days of receipt of application complete in all respect

99%

11

Conversion of LT single phase to LT three phase, Conversion from LT to HT and vice-versa

Within 30 days from the date of payment of charges

99%

12

Redressal of consumer’s complaint regarding billing

If no additional information is required

Within 24 hours of receipt of Complaint

99%

If additional information is required

Within 7 days of receipt of Complaint

99%

13

Reconnection of supply following disconnection

Cities and Towns

Within 6 hours of receipt of payment from consumer

99%

Rural Areas

Within 12 hours of receipt of payment from consumer

99%

14

Refund of Advance Consumption Deposits/ Consumption Security, meter Security

Within 30 days after receipt of request

99%

15

Issue of No Due Certificates

Latest by 5PM next day of receipt of request

99%

16

Shifting of meter/ Service Connection/ Lines/ Equipments

Shifting of meter/ Service Connection

Within 15 days after receipt of request along with prescribed charges

95%

Shifting of LT / HT Lines

Within 45 days after receipt of request along with prescribed charges

Shifting of Transformer Structure

Within 60 days after receipt of request along with prescribed charges

17

Distribution Transformer failure rate

Urban areas

 

Shall not exceed 5% p.a.

Rural area

 

Shall not exceed 10% p.a.

18

Faulty Meters

(MNR, Burnt, Sticky, etc.)

 

 

Shall not exceed 1 % of metered installations

19

Billing Mistakes

 

 

Shall not exceed 0.1% of consumers billed

20

Voltage variations at supply point

 

 

The voltage variation shall be within the limits stipulated hereunder

a) LT system, between +6% to -6%

b) HT system between +6% to –9%

c) EHT system, between +10% to 12.5 %

21

Reliability Indices

The reliability indices mentioned hereunder shall be computed separately for urban and rural feeders.

a) Average number of interruptions in 11KV feeders.

b) Average duration of interruptions in 11KV feeders

c) Average number of interruptions per consumer

d) Average duration of interruption per consumer,

The Commission will lay down the standards separately later on.

SCHEDULE – III

 FORMAT FOR ASSESSING OVERALL PERFORMANCE LEVEL OF DISTRIBUTION LICENSEE

Report for the month of _____________

Name of the Licensee                                     :
Total No. of services                                       :
Total No. of Distribution Transformers        :

 

S. N.

Nature of Service

Nos. of complaints received

Nos. of complaints attended

% age attended

Overall Standards of Performance

1

Normal fuse-off Calls

Cities and Towns

 

 

 

99%

Rural Area

 

 

 

2

Line Breakdowns Calls

Cities and Towns

 

 

 

95%

Rural Area

 

 

 

3

Distribution Transformer Failure

Cities and Towns

 

 

 

95%

Rural Area

 

 

 

4

Major Power Failure involving Power Transformer / Equipment etc.

Cities and Towns

 

 

 

95%

Rural Area

 

 

 

5

Period of Load Shedding

Not to exceed 4 hrs. per day continuously for 4 days

 

 

 

95%

6

Period of Scheduled outage

Maximum duration at a stretch

 

 

 

99%

Restoration of supply

 

 

 

7

Voltage Variations

Where no expansion of network is involved

 

 

 

95%

Where up-gradation of LT distribution system is required

 

 

 

90%

Where up-gradation of High Tension / EHT distribution system is required

 

 

 

85%

Opening of neutral and neutral voltage exceeding 2% of supply voltage

 

 

 

99%

8

Meter Complaints

Inspect and check correctness

 

 

 

95%

Replace slow/fast meters

 

 

 

Replace creeping or stuck meters

 

 

 

Replace burnt meters if cause not attributable to consumer

 

 

 

Replace burnt meters in all other cases

 

 

 

9

Application for new connection/Additional load connection/ Temporary

Release of supply where service is feasible from existing network

 

 

 

95%

Release of supply where Distribution Network expansion / Commissioning of New Sub Station required for providing connection

 

 

 

95%

Agriculture Pump Sets

 

 

 

80%

10

Transfer of ownership, change of Category

 

 

 

 

99%

11

Conversion of LT single phase to LT three phase, Conversion from LT to HT and vice-versa

 

 

 

99%

12

Redressal of consumer’s complaint regarding billing

If no additional information is required

 

 

 

99%

If additional information is required

 

 

 

99%

13

Reconnection of supply following disconnection

Cities and Towns

 

 

 

99%

Rural Areas

 

 

 

99%

14

Refund of Advance Consumption Deposits/ Consumption Security, meter Security

 

 

 

99%

15

Issue of No Due Certificates

 

 

 

99%

16

Shifting of meter/ Service Connection/ Lines/ Equipments

Shifting of meter/ Service Connection

 

 

 

95%

Shifting of LT / HT Lines

 

 

 

Shifting of Transformer Structure

 

 

 

17

Distribution Transformer failure rate

Urban areas

 

 

 

Shall not exceed 5% p.a.

Rural area

 

 

 

Shall not exceed 10 % p.a.

18

Faulty Meters

(MNR, Burnt, Sticky, etc.)

 

 

 

 

Shall not exceed 1% of metered installations

19

Billing Mistakes

 

 

 

 

Shall not exceed 0.1% of consumers billed

20

Voltage variations at supply point

 

 

 

 

The voltage variation shall be within the limits stipulated hereunder

a) LT system, between +6% to -6%

b) HT system, between + 6% to -9%

c) EHT system, between +10% to –12.5%

21

Reliability Indices

The reliability indices mentioned hereunder shall be computed separately for urban and rural feeders.

a) Average number of interruptions in 11KV feeders.

b) Average duration of interruptions in 11KV feeders

c) Average number of interruptions per consumer

d) Average duration of interruption per consumer,

The Commission will lay down the standards separately later on.

 